Sewage system and purifying plant Beltinci

Project relates to sewage system, designed as a separate system for feces in a waterproof system. 

Sewage system will be laid as a closed type from all the residential buildings into the biological purifying plant Melinci. Total length of primary lines is 36,667 m, from which there are 17,793 m of gravitational and 18,874 m of pressurized pipes. A new purifying plant Melinci is a mechanical-biological type with 15,000 PE.

Other projects
Pomgrad inquiry

Do you need our services?

Send us your query and we will respond in the shortest time possible.