Boxmark Zlatar Bistrica

The new production hall is intended for cutting, storage, and final processing of leather and is located between two existing halls in Boxmark plant Zlatar Bistrica. 

The production hall with 2,200 m2 on the ground floor and 90 m2 on the 1st floor, and the building height is 10.30 m. A base of the object is prefabricated reinforced concrete structure made of pillars, struts and façade. We used 1,250 m3 of concrete and 81,500 kg of steel for the construction works and plate. The prefabricated construction was made of 400 m3 of concrete and 66,500 kg of steel. 