Drinking water supply in Drava basin - framework 3

The project covers a construction of pipeline in length of 40 km with ductile pipes DN 80–150 mm. 

In the framework of water supply system, there are also 6 water tanks and 3 pumping stations along with a shared center for both municipalities plus associated ones (Dravograd, Muta in Vuzenica). Included in the framework of the renovation of water supply there is also a reconstruction of roads on which the water lines will be changed.