Renovation under Malečnik

In the framework of the project, 780 meters of a new road section have been constructed as the whole area had to be arranged with supporting elements. As a protection from falling stones, a 210 m long gallery has been built with connection to the Malečnik bridge. Along with the renovation of the road surface and newly built gallery, new pedestrian tunnels, cycle tracks and 338 m of support constructions have been built; 651 meters of water stream from Zokova grapa have been regulated along with municipal installations and drainage. 